Case Study – Sample Project

Sample Project: Industrial Pump Upgrade

Client: DRC Mining Company | Location: Katanga, DRC

The Challenge

Our client needed to replace a failing pump system in their cobalt extraction plant, which was causing production delays and increasing maintenance costs.

Our Approach

We sourced high-performance pumps from a trusted OEM, coordinated expedited shipping, and provided on-site technical support during installation. We also trained the local team on maintenance procedures.

Project photo

Results

  • Increased pump reliability, reducing unplanned downtime by 30%.
  • Improved production throughput by 15%.
  • Reduced maintenance costs by 20% annually.
  • Delivered within 3 weeks, meeting the client’s urgent timeline.

expansions.africa/ delivered beyond our expectations. Their local knowledge and technical expertise were invaluable.

– Client Manager

Let’s solve your challenges too.