Sample Project: Industrial Pump Upgrade
Client: DRC Mining Company | Location: Katanga, DRC
The Challenge
Our client needed to replace a failing pump system in their cobalt extraction plant, which was causing production delays and increasing maintenance costs.
Our Approach
We sourced high-performance pumps from a trusted OEM, coordinated expedited shipping, and provided on-site technical support during installation. We also trained the local team on maintenance procedures.
Results
- Increased pump reliability, reducing unplanned downtime by 30%.
- Improved production throughput by 15%.
- Reduced maintenance costs by 20% annually.
- Delivered within 3 weeks, meeting the client’s urgent timeline.
expansions.africa/ delivered beyond our expectations. Their local knowledge and technical expertise were invaluable.
– Client Manager